Stucco |
Mist |
Dipped |
Time |
Notes |
| 01 | None | | | | |
| 02 | None | | | | |
| 03 | None | | | | |
| 04 | Fine sand | | | | |
| 05 | Fine sand | | | | |
| 06 | Fine sand | | | | |
| 07 | Medium sand | | | | |
| 08 | Medium sand | | | | |
| 09 | Medium sand | | | | |
| 10 | Coarse sand | | | | |
| 11 | Coarse sand | | | | |
| 12 | Coarse sand | | | | |
Process notes
- Minimum 1 hour drying time between each coat.
- Before each dip, mist shell surface lightly with Remasol SP-30 spray bottle.
- All 12 coats use the same slurry — no prime/backup distinction.
- Coats 1–3: dip only, no stucco. Coats 4–6: fine silica sand. Coats 7–9: medium silica sand. Coats 10–12: coarse silica sand.
- Apply stucco immediately after dipping while slurry is still wet.
- Allow full overnight dry after coat 12 before burnout.